iCIndiaCalculators .org Verified 29 October 2026
Home › Construction & Real Estate › Brick calculator
Construction & Real Estate

Brick calculator

Enter your wall size and get the brick count, cement bags and sand — with the standard 10 mm joint and 5% wastage built in.

Last verified 29 October 2026 Sources 1 No sign-up, no storage Formula and sources shown
Your numbers

No sign-up, no storage. Everything is calculated in your browser — nothing you type is sent anywhere. Change any input and press Calculate again.

Checked, not guessed.1 source, 3 build tests and a changelog are on this page.
Your result
Enable JavaScript to see your result here. The method, formula and reference table below still explain the answer.
The method

How it is calculated

The formula this page actually runs

Brickwork is measured by wall volume, then converted to bricks and mortar. The calculator follows the same order a site engineer does.

Formula Bricks = wall volume ÷ 0.002 × (1 + wastage) · Cement = dry mortar ÷ (1 + mix ratio) ÷ 0.0347
01

Measure the wall

Length × height × thickness gives wall volume. A 4.5-inch wall is 0.115 m thick; a 9-inch wall is 0.23 m.

02

Convert volume to bricks

A 190 × 90 × 90 mm brick with 10 mm joints occupies 0.002 m³, so about 500 bricks fill one cubic metre.

03

Add wastage, then mortar

Breakage is applied to the brick count. Mortar is the remaining volume, multiplied by 1.33 for dry mix, then split into cement and sand.

The numbers

Brick and mortar reference

Reference values, not hidden defaults
ItemStandard valueWhy it matters
Modular brick190 × 90 × 90 mmThe size behind the 500-bricks-per-m³ rule.
Brick with 10 mm joint200 × 100 × 100 mmJoint thickness is part of the volume.
Bricks per m³500Thumb rule for a single-brick wall.
Dry mortar factor1.33Wet mortar shrinks; buy dry materials.
One cement bag50 kg = 0.0347 m³How bags are counted.
Common mortar mixes1:4, 1:5, 1:6Cement : sand by volume. 1:6 is usual for brickwork.
Standard values used by the calculator. Local bricks and site practice can differ.
Before you use it

What most pages get wrong

4 things worth knowing before you use the number
01 · The joint

Bricks are counted with mortar, not without it

The 500-per-m³ figure includes a 10 mm joint. Counting only the brick gives you a lower number and a short order.

02 · The wall

Thickness doubles the count

A 9-inch wall uses roughly twice the bricks of a 4.5-inch wall for the same face area — the height and length are unchanged.

03 · The wastage

Buy for breakage

5% is normal for a clean site; 10% is realistic when bricks are moved by hand or cut.

04 · The mix

Cement bags move with the mix ratio, bricks do not

A 1:4 mortar uses more cement than 1:6 for the same wall. The brick count stays the same.

Questions

Frequently asked questions

The queries people actually search
How many bricks are needed for a 10 × 10 ft wall?+
For a 4.5-inch wall, 10 × 10 ft is 9.29 m²; at about 57.5 bricks per m² that is roughly 534 bricks before wastage. The calculator does this exactly for your wall size.
How much cement is needed for 1,000 bricks?+
With a 1:6 mortar, about 2.5 bags of 50 kg cement. A stronger 1:4 mix uses more — the calculator shows the bags for your wall.
Should I add wastage?+
Yes. 5% is standard; use 10% if the wall has many openings, corners or cut bricks.
Does the calculator work for a 9-inch wall?+
Yes — choose 230 mm thickness. The volume doubles for the same face area, and so does the brick count.
What is the standard brick size in India?+
The modular brick is 190 × 90 × 90 mm; with a 10 mm joint it becomes 200 × 100 × 100 mm. Traditional local bricks can vary, so confirm the size before ordering.
Why does the sand figure look small?+
Sand is shown in cubic metres of dry mortar after splitting the mix. One cubic metre of sand is about 35.3 cubic feet — multiply if your supplier quotes cft.
Trust layer — how to check this page

Sources, dates and a changelog.

Every number this calculator uses is either an input you control or a value from the sources below. The formula is compiled and tested at build time, so the page cannot ship with a broken calculation.

Sources

This page

  • Last verified: 29 October 2026
  • Next review: 29 April 2027
  • Vertical: Construction & Real Estate
  • Build tests: 3 passed
  • Changelog: 1 entry

How we handle errors

  • Spotted a mistake? Report it — we correct and log it.
  • Corrections appear in the changelog below.
  • Read the methodology and the disclaimer.
Changelog
2026-10-29First published.